Change and calculus

10 June 2000

The swaying footbridge

Arup engineers; Dallard and colleagues

How can people walking normally make a steel bridge sway?

London’s Millennium Bridge opened on 10 June 2000 and swayed so much it closed two days later. As the deck leaned, walkers adjusted their steps to keep their balance, and those steps pushed it further. Engineers fitted dampers, which soak up motion like a car’s shock absorbers, and it reopened in 2002.

First, make a guess

As more walkers fall into step, what happens to the sway?

How they figured it out

On opening day, 10 June 2000, around 90,000 people crossed London’s Millennium Bridge, with up to 2,000 on the deck at once, and it swayed sideways by up to about 7 cm. Engineers at Arup ran crowd tests and found something surprising: the sway did not grow gradually. It started suddenly once enough people were walking.

People on a gently swaying deck widen their stance and time their steps with the sway, which pushes it further. The fix cost about £5 million: 37 fluid-viscous dampers and around 50 tuned mass dampers. The bridge reopened in February 2002 and has been steady since.

The equation

mx¨+(c−Ncw) x˙+kx=0m\ddot x + (c - N c_w)\,\dot x + k x = 0

A guitar string’s equation plus one term: the crowd’s push. When it beats the damping, sway grows.

Everyday echoYou’ve felt this pumping a playground swing: small pushes, in time, build big swings.

See it in real life

Soldiers break step

Pump a playground swing with small pushes in time and it goes higher and higher. Soldiers are told to break step when crossing bridges; in 1831, Broughton Suspension Bridge near Manchester collapsed under marching soldiers.

Where engineers use it

  • Structural design

    Footbridges are now checked for crowd-induced lateral sway, a rule written because of this bridge.

  • Dampers

    Tuned mass dampers and viscous dampers protect skyscrapers from wind and earthquakes.